December. 10, 2019
There are different installation methods for sound insulation walls in common highway construction forms, which can be divided into shallow pile continuous beam installation type, driven pile type, frame type and other types.
It is particularly common to install road noise barriers on highways. Because there are some differences in the size and structure of highway noise barriers, the installation of highway noise barriers is set according to the specific structure of the actual road sections and the differences in locations.
The installation methods of sound insulation walls in common highway section construction forms are different, and can be divided into shallow pile continuous beam installation type, driven pile type, frame type and other types. Specifically, you can plan the installation method in the early stage. Take the method of installing highway sound insulation walls with shallow-pile continuous beams as an example, because this installation method is currently a more common method of installing sound insulation walls in highway sections.
In the early stage, you need to prepare concrete, use concrete to fill piles and continuous beams, and install them in cooperation with each other. When pouring concrete, note that the length of the pile is less than four meters, and the diameter is within one meter. This is why it is called Due to the shallow pile, the ground beam sound insulation wall of the highway also needs to be installed with ground beams. The height of the ground beams is within one meter and the width is within 0.5 meters. This pile is mainly connected to the top of the pouring pile and the pile body. In the meantime, the shallow piles are fixed and connected to disperse the force. This fixing is to prevent the weather from raining on the sound insulation wall. It is mostly used on sloped sections. The installation method seems to be slightly more complicated. Actual installation It is not so complicated. It is very simple to answer. Mechanical operation and installation can also be performed. Manual installation can also be performed, which is more suitable for later quality supervision.